If a mechanic was initially trained as a Lane Maintenance Mechanic and is being promoted to a Pinsetter Technician, only the items that are new will require training, dating and signature when completed. It is recommended that each item, from a newly hired person, be completed first, before proceeding to the next item(s). To be fully trained in each level, all job duties must be dated and signed. Each item has certain duties pertaining to the maintenance position. Enter the mechanic s name and the date they were hired for that position. Select the training item for the position of the mechanic. Once a mechanic has been trained, they are then eligible to train other mechanics for the same procedure. They will start the training procedures at each bowling facility for other mechanical positions. The focus is to train every chief mechanic. All bowling center lane maintenance mechanics, pinsetter technicians, assistant mechanics and chief mechanics will be trained through the mechanics training program.
BRUNSWICK GSX PINSETTER EJ MANUAL
7 Pinsetters GS SERIES PREVENTIVE MAINTENANCE PROGRAM.10 Instructions for GS Pinsetters Preventive Maintenance Work Schedule GS Pinsetters Preventive Maintenance Work Schedule Form.18 GS Pinsetters Pending Items Form.20 GS Pinsetters Parts Usage Log Form.21 GS PINSETTERS DAILY STOP RECORDS.22 GS Series Stop Sheet Form.23 GS Series Pinsetter Error Codes Form.24 GS SERIES PINSETTER WEEKLY FRAMES PER STOP RECORDS.25 GS Series Pinsetter Weekly Stop Report Form.26 GS SERIES PINSETTER MONTHLY FRAMES PER STOP RECORDS.27 Universal Monthly Frames Per Stop Record Form.28 CONTROL COUNTER MALFUNCTION REPORT.29 Control Counter Malfunction Report Form.30 Automatic Scorers AUTOMATIC SCORER PREVENTIVE MAINTENANCE SCHEDULE.31 Automatic Scorer Preventive Maintenance Schedule Form.32 Lanes LANE PREVENTIVE MAINTENANCE SCHEDULE.33 General Lane Maintenance Schedule.34 Lane Preventive Maintenance Schedule Form.35 Bowling Equipment - Product Trouble Report and Warranty Policy BRUNSWICK PRODUCT TROUBLE REPORT.36 Product Trouble Report Form.38 Universal Date Codes Form.39 Error Codes Form.40 Warranty Schedule.41 Bowling Center Maintenance KEY AREAS TO NOTE.45 Climate Control.45 Cleanliness.45 BOWLING CENTER MAINTENANCE SCHEDULE.46 Bowling Center Maintenance Schedule Form.47 Bowling Center Safety General Safety Tips.51 Customer Safety.51 Prevent Slips and Falls.52 Center Manager s Monthly Inspection Report Form.53 Monthly Safety Check List Form.54 Bowling Center Operating Procedures Manual 3Ĥ Administrative TYPICAL MECHANIC S CLIPBOARD SYSTEM FOR BCOP PROCEDURES Mechanic s Training Program Training on safety, customer relations, commitment, communication and organization are key for successful preventive maintenance programs and customer service. 4 TYPICAL MECHANIC S CLIPBOARD SYSTEM FOR BCOP PROCEDURES. Box 329 Muskegon, MI U.S.A Bowling Center Operating Procedures Manualģ Contents Administrative. Brunswick Bowling and Billiards 525 West Laketon Avenue P.O. Reorder Part No Notice: If available, updates to this manual can be found on-line at All information contained in this document is subject to change without notice.
BRUNSWICK GSX PINSETTER EJ PLUS
Frameworx, Classic, Vector, Vector Plus and GS Pinsetter area registered trademarks of the Brunswick Bowling and Billiards Corporation. 1 Operations Manual Bowling Center Operating Procedures September 2005 /Ģ Bowling Center Operating Procedures Manual September 2005 by the Brunswick Bowling and Billiards Corporation.